Kormoran II
Initial Operational Capability (IOC) : November 28, 2017
Total Production : 6
Model | Status | Year | Produced |
---|---|---|---|
Kormoran II | Active | 2017 | 6 |
Kormoran II
Group : Mine CounterMeasures Vessels
Status : Active
Also Known As : Project 258
Origin : Poland
Contractor : Remontowa Shipbuilding
Initial Operational Capability (IOC) : November 28, 2017
Total Production : 6
The Kormoran II, also known as Project 258, is a new class of minehunters built by Remontowa Shipbuilding for the Polish Navy. A first batch of three vessels was delivered between 2017 and 2022. Another three vessels are expected to be commissioned in the 2026-2027 timeframe. The Kormoran II minehunters are equipped with a 35mm anti-aircraft gun system and Double Eagle Sarov unmanned underwater vehicles for mine disposal.
Operators
Country | Status | State | Notes |
---|---|---|---|
![]() | Active | 2/6 |
Specifications
Notes | ||
---|---|---|
Crew | 45 | |
Number of Engines | 2 | |
Dimensions | ||
Beam | 10.3 meter | |
Draft | 4.7 meter | |
Length | 58.5 meter | |
Main Gun Caliber | 35 millimeter | |
Performance | ||
Max Range | 2,500 nautical mile | |
Speed | ||
Top Speed | 10 knot |
Gear
Unmanned Underwater Vehicles | ||
---|---|---|
Double Eagle Sarov | 1 |
Listing
Ship | Status | Com | Decom |
---|---|---|---|
![]() |
Active | November 28, 2017 | |
![]() |
Active | October 2021 | |
![]() |
Active | November 2022 | |
![]() |
Planned | 2026 | |
![]() |
Planned | 2027 | |
![]() |
Planned | 2027 |
News

Saab has received an order for deliveries of additional underwater vehicles called Double Eagle SAROV (Semi-Autonomous Remotely Operated Vehicle); these are to be used for
Photo Gallery
Notes
State Latest Known holdings/Original Procurement
Com - Date of Commissioning
Decom - Date of Decommissioning
Copyright © 2003-2025 deagel.com website. All rights reserved.